You are viewing this site in staging mode. Click in this bar to return to normal site.

Electrics and Lighting

The electrical installation will be upgraded to remove the current extension cords which power items within the building. Ducting will be included under the floor and safe power sockets will be located around the church building to provide power wherever it may be needed.

The lighting system will be upgraded to take advantage of new, more energy efficient technology. The current chancel lights have failed, and the nave is only lit in the side aisles. New lighting technology will be able to illuminate architectural features and provide many more options for lighting different types of events and services.

Photograph: St John the Baptist, Royston 
$(function() { $("#h-nav").sticky({ topSpacing: 0 }); });