Once the old heating system was out of the way and the new underfloor technology was installed, the floor was levelled. Accessibility was a big concern, so the church has now become step free from the entrance door through to the communion rail in the chancel.  From the porch, with its electric doors and all the way through to the chancel, the floor is completely level. The final floor finish used a mix of old bricks and new bricks that match the previous flooring surface. Materials were reused and repurposed wherever possible throughout this project.  Some of the pew ends were repurposed within the new furniture.

Photograph: St Mary's, Stebbing, showing level floor