You are viewing this site in staging mode. Click in this bar to return to normal site.

Level Floor

Once the old heating system is out of the way and the new underfloor technology is being installed, the floor will be levelled. Accessibility is a big concern, so the church will become step free from the entrance door through to the communion rail in the chancel. A gentle ramp will be created in the porch to allow easier access and the main floor will be levelled to remove the step to the chancel. The final floor finish will use bricks that match the current flooring surface. Materials will be reused and repurposed wherever possible throughout this project.  Bricks that can be reused will be.  Some of the pews will be repurposed as new furniture.

Photograph: St John the Baptist, Royston, showing level floor 